Learn about our disaster recovery efforts in Baton Rouge >

Solar Installation at Buckeye Union High School District

Buckeye, AZ

Client: Constellation Solar Arizona, LLC

Architect: Orcutt | Winslow Partnership

Project Summary

The Solar Installation at Buckeye Union High School District project, built for Constellation Solar Arizona, LLC., included the new construction of 4.29 megawatt photovoltaic solar arrays at two schools located in Buckeye, Ariz. and one school in Goodyear, Ariz. The array functions as a renewable power source by converting solar energy from direct current into alternating current and distributing energy to the service entrance sections of each school. Construction of the photovoltaic solar arrays consisted of mounting 15,468 solar cells on 29 steel carport canopy shade structures and two ground mounted systems. Due to CORE's energy efficient construction practices, the Solar Installation at Buckeye Union High School District project met the goal of earning incentives for solar energy from Arizona Public Service by providing 70% of the Buckeye Union High School District's energy needs through renewable solar energy.

Solar Installation at Buckeye Union High School District

Let's Work Together

Let's Work Together

Subcontract with CORE

Our subcontractors are the heart of our team. They share our commitment to Operational Excellence and treat every project like it's the most important one yet. Want to start building communities with us?

Pre-Qualify Now